Make certain the end of the plywood panel is positioned at the middle of floor joist and secure the panel in place using decking screws approximately 12 inches apart and within 3 inches of the edge at each joist. The second (top) layer of plywood joints should not coincide with the joists and the second layer should not be fastened to the joists. Liquid Nails for Subfloors is a common product for this job. Make sure no one is standing below so the pieces can fall freely to the ground. The rings help to keep the nails from easily popping out (creating a potentially squeaky floor). All Rights Reserved. It aids during installation if the joists are installed exactly 16 inches on center throughout the floor. Step 5: Tap the subfloor into place. This span rating for plywood defines how far apart joists can be. When we got to the stair openings, we kept to the pattern (pretending there is no stair opening) and nailed the subfloor down on the other side. That’s basically how to install plywood underlayment. Be sure the joists are dry and free of dirt before applying. Step 8 Make sure your contractors are careful through each stage. Once you’ve installed a vapor retarder, install your subfloor. Sheets of 3/4" plywood weigh as much as 90 pounds!!! Not so much the case ... we built stairs, backfilled, insulated ... just to name a few projects that had to get done as I tried not to glance up at those open floor joists ... and finally it's plywood day. Step 3: Lift up the plywood and put construction adhesive across the joists. New sheets are carefully pounded in place with a block protecting the open groove side of the plywood. We prefer 2 inch subfloor nails with reverse threads and coated in glue. Also, donâ t forget to wear proper safety Your goal is to have the plywood end exactly half way across the joist, so that the new plywood can start on this spot. After each sheet of plywood is layed down, I went and marked the open edge, with a mark centered on the open floor joist. Remember, plywood only has a tongue and groove on the sides, not on the edges, since these will be nailed into the joist. Replacing Entire Subfloor With new 5/8″ Plywood. On the four foot edges, your seams will fall on joist tops, so no need for tongue and groove. Remember, you only do this for the first row of plywood. Fasten your first layer plywood subfloor as you normally should. After patching the subfloor and restoring the underlayment as shown in the photos it was time to glue and nail down a second very thin underlayment 1 4 in to assure a perfectly smooth surface. All houses have joists, except those with a concrete slab subflooring. Nail the opposite corner lengthwise down the sheet, being careful to check the alignment on the edge of the joist below. Also, these nails come coated in a glue on the shank, further helping keep the nails nailed down. We measured and marked where the joists were so we could nail into them. Then I got in trouble for making bad marks .... We all chuckled later when we realized I had had some help! For hardwood floors, use some felt layer over the plywood underlayment for better results. Coming from past experiences of screwing down subfloors, this really felt like we were cheating. Laying your first piece in the outside corner of the floor you want the long dimension of the plywood to lay across six joists with the final edge ending up in the center of the 6th joist. Install one sheet of plywood at a time. If you’ve positioned the plywood correctly, it should be sitting half-way over the joist, right next to the adjacent piece, as shown below. Make sure the plywood is square. Charlie: Or super glue. Step 2: Measure and dry-set the first piece. Take our word for it: this is important and very hard to correct if done improperly. We are using ring shank nails, or nails with rings on their shanks. If you are thinking of laminate, use a pad to cover the underlayment. Next is the subfloor. The subfloor is typically made from plywood or oriented strand board (OSB). To move ahead to Part 2, click here.. Solid joists take longer to burn through, and will provide structural support longer. Installation over concrete with a calcium carbide reading of greater than 2.5 percent. You will notice that there is maximum flexing at the areas between the floor joists where two sheets of plywood meet. Step 6: Check that the sheet of plywood is square and tight against both sides. You guessed it, we'll be back to the half sheet on the next row. Installing wood subfloors over concrete how to install a plywood subfloor one installing wood subfloors over concrete how to install a subfloor on joists how to install subfloor panels 9 common subfloor mistakes and how to. (I'll be blogging about all the other projects we've been up to as well in the next coming bit). Not exactly a Melissa and Doug puzzle! Then when we went to put the remaining piece in, everything keeps to the pattern, fitting just right, like a perfect puzzle, only the pieces are 48" x 96" and weigh 90 pounds. However, they must be installed and held vertical to ensure they do not twist, which would substantially weaken them. Although OSB (orient strand board) is sometimes used, the most commonly used type of wood is C-D grade tongue and groove plywood. These chalk lines run the entire depth of the Momplex, perpendicular across each floor joist, every four feet. If you do this properly, you’ll have a beautiful plywood subfloor. To install a floated subfloor system, first place a layer of plywood subfloor panels with the edges parallel to the wall. In this installation, we used Portable Cable’s Round Head framing nailer. At times it may be necessary to go shorter on this measurement, but when this happens, the plywood will need to be cut to accommodate the shorter length. how to install plywood over existing subfloor. It is exceedingly important that the first whole line of plywood sheets be perfectly straight and square. Tell me, does anyone else feel like they are getting stretched apart hauling a full sheet of anything? We dry-fitted the plywood over the shims to make sure the new subfloor was even with the rest of the flooring. This is best achieved using a sledge hammer and a tapping block. 7.3 - Before you place each panel, apply a bead … Somewhere I saw something about leaving 1/8" gap. And it should be ready for the next flooring installment. The boards are laid lengthwise, perpendicular, over joists and joined together. Errors tend to compound as you work through these steps. Charlie: Okay. Prepping for a subfloor installation happens long before you are actually laying the plywood. (There is a picture of this below.) Put a nail every 8-10 inches on the surface. Step 9: At this point, the plywood subfloor is complete. To install a floated subfloor system, first place a layer of plywood subfloor panels with the edges parallel to the wall. Another approach would be to completely cover the project with large tarps in between efforts. The cost to do this throughout the 1,200 sf home was about $1,000 for materials and labor. Step 4 Nail down the rest of the sheet, spacing nails about every 12 to 18 inches apart down the joist. Side-to-side spacing between our joists is 18 inches on center at its greatest. Screws are needed to fix down the new sub-floor. We can say that our subfloor feels super sturdy! Matching up with the chalk line, reaching the center of the joist. The spacing of the joists supporting the floor determines the plywood thickness. The right glue is very important here, it's what keeps your floor from squeaking. Assuming a remodel, this is going to involve bringing the plywood to the location by hand, as opposed to assistance by a crane. As with all major construction projects, you should consider consulting a professional before attempting a job like this on your own. https://vinawoodltd.com/wp-content/uploads/2020/09/logovinawoodsmall1-1.png, https://vinawoodltd.com/wp-content/uploads/2020/11/trim-edge-of-plywood-subfloor.jpg, Copyright © 2020 VINAWOOD Co., LTD. Headquarter: 92 Thien Duc, Yen Vien, Gia Lam, Hanoi, Vietnam | Hotline: +84-83-333-2333 | Email: Email: plywood@vinawoodltd.com |, Consider both load bearing capacity and deflective properties when selecting subfloor materials. If you did this without a block, it would destroy the groove and make fitting the next row of plywood very difficult. And this is how we lay the subfloor on top of those floor joists ... On the tops of the floor joists, we measure and mark every 4 feet - this will be the plywood seams. Next, lay a second layer of plywood at a 45-degree angle to the … The tongue and groove are only along the 8 foot edges. Never go longer unless you have rechecked the spanning distance on the plywood and joists you are installing, as this could create a weak spot in the floor. You can see in this picture that the plywood sheets making up the subfloor in this house are tightly joined together. Carhartts are the new fashion accessory! Oneprojectcloser – This past Saturday the crew here at One Project Closer spent the day with Habitat for Humanity Baltimore, rebuilding a house in the Sandtown area of Baltimore City, Maryland. Every once in a while, I have been sneaking up to sit on the floor joist, just dreaming of this day! The view up there is amazing. In my mind, there's even a waiter with a tray full of drinks with little umbrellas. Uncategorised; how to install plywood over existing subfloor This video covers measuring cutting and the correct tricks for installing to ensure a good bond and long lasting results that never squeak. Cupping occurs when hardwood floorboards begin to curl along the length of the board, somewhat like a taco shell but less pronounced. The idea is to get the plywood fastened and take one last look before you fasten it completely. Nobody likes a nail popping up in the floor! Later this week we will be showing wood I-joist installation, both with a rim joist, and without, in a situation where a rim joist cannot be installed due to the position of the wall next to an adjacent house. First, renail the existing plywood subfloor, so that the old nails are tight, and add new nails to achieve a maximum nail spacing of 6 inches. Chalk lines are pulled all the way across all the joist tops at the 4 foot marks so we can check our accuracy with each sheet of plywood being attached to the joists. This site uses Akismet to reduce spam. At 16″ on center, there will be 7 joists under each piece of plywood, and each piece will end in the middle of the next joist. Tom: Yeah. Steps to Install 3/4 Inch Plywood Subfloor Step 1: Get the plywood to the right level of the house. Where floor joists are spaced 16 inches on-center, whether or not a 3/4-inch plywood subfloor is adequate for this type of installation is a judgment call. Each subsequent piece of plywood will depend on the first piece being installed correctly. We put the floor joists in in this post. Then I traced a line to the mark I had made on the previous sheet of plywood, making it easy to find the joist and nail the plywood to it. So it is critical that the second sheet of plywood stagger those weaks spots to get maximum rigidity in the floor prior to tiling. The second (top) layer of plywood joints should not coincide with the joists and the second layer should not be fastened to the joists. Also, these joists are not as safe in a fire. Plywood underlayment is typically needed when a floor material must have a very smooth, flat surface. Step 1: Get the plywood to the right level of the house. Stagger adjacent sheets so that they do not start on the same joist. The floor of any building or structure is its base and one of the most important parts, so when preparing to lay a plywood subfloor there are several things to keep in mind. We shared the day with a dozen volunteers, working primarily on structural components of the house, including installing floor joists, installing a 3/4 inch plywood subfloor, adding fire stops to first and second floor walls, and adding additional plywood sheathing to the exterior of the house. For example, if you install resilient tiles or sheet flooring over a subfloor, any bumps, dips, or voids in the subfloor may be evident in the finished flooring. Repair any broken planks. A 3/4 inch sheet of plywood weighs approximately 75 lbs. Step 2: Measure and dry-set the first piece. We used a DeWALT 10″ circular saw for the job. Lay the panels out flat to cover the subflooring. You do it on the top of the joists and then you put the subfloor down on the joists and glue it and nail it and screw it and that glue will bond it down, construction adhesive. 3 Answers. Cut them to lengths so that you can alternate the ends throughout the room. Step 4 Repeat Steps 2 and 3 to install … We started first with a 1/2 sheet. Here's wishing plywood was like 45" wide, or I was like three inches taller. Select the smooth side of the plywood to be facing up. When installing decking you should lay the pieces so the long dimension of the plywood extends across the joists and the short dimension runs up the joist length. The Wood. You can see on the non tongue and groove side of the plywood, joints are made in the center of the joists. How to install plywood to a subfloor around a toilet. Ensure that the sheet is still in the correct position, then nail down all four corners. It’s important to note that when installing the plywood sheets, do NOT nail within 10 inches of the side closest to the tongue UNTIL the adjacent sheet is hammered in. You should leave these nails about 3/4″ out of the plywood to make pulling them easy if everything isn’t right. Because this floor may be exposed to weather before the second floor and roof can be installed, we covered it with Zinsser Shellac. The second floor of this house is built with 2 x 10 wood I-joists (joists that resemble steel I-beams and are 9.5 inches thick), 16″ on center and spanning 13.5 feet. Charlie: On the subfloor? You likely won’t be able to push the plywood into place by hand. When you are going 44 feet wide, if you get off 1/8" here, 1/4" there, a hair over there ... you'd be surprised at how fast that can add up to inches! These joists are stronger than comparable solid wood joists, provide a 66% larger nailing surface for the plywood subfloor (2.5 inches instead of 1.5 inches) and are more uniform than traditional lumber joists. Did you leave any expansion gaps between the short ends of the plywood? Spanning ratings for plywood and OSB are based on this assumption. NOTE: This is Part 1 of a 2 part series. Farmhouse Bed for American Girl or 18" Dolls, Frameless Bookshelf Customizeable Sizes Template, Trimmed and ready for Christmas - Dollhouse, our modified version of printers sideboard. You can see in the picture below that the set nail should be placed about 10 inches off the tongue edge of the board. Nails need to be 8d, spaced every 4" and staggered. But to start off, we will need to remove the tongue so the plywood is tight with the exterior ICF walls. Always install plywood or OSB long-ways across the joists. Make sure the plywood is square. It is installed directly on top of the joists and provides more overall stability as well as a certain amount of moisture protection. The wood i-joists are more forgiving than traditional joists because they have a wider nailing flange. Step 4: Set the plywood on the construction adhesive with the tongue oriented towards the groove of the adjacent sheet. Stagger the joints so no joint runs into another joint. The sledge hammer will easily mar the plywood subfloor making it difficult to fit the next sheet into place. I just set my saw blade to the depth of the plywood and ran it down the edge, removing the tongue. Since 2009. I was so thankful our cousin Justin was here to pack plywood upstairs. Install Subfloor Over Joist Flooring; How To Install Subfloor On Joists Reinforcement Learning; Install Subfloor Over Joist Flooring. How to Install a Subfloor on Joists Submitted by Ana White on Thu, 10/13/2011 - 00:50 We put the upstairs floor joists up, and I thought the very next day I'd be getting a sun tan on a roof top deck. Re-secure any loose wood subfloor planks, OSB, or plywood subfloors to the floor joists using 2-1/2" deck screws. Dry fit components first to make sure sheets land on the center of joists. You’ll be hammer on the tongue edge of the board. This will make installing surface flooring a much simpler task. For subflooring, you use tongue and groove plywood. Don’t skip using the block. Copyright 2009-2011 Ana White/Ana White.com. Plywood and OSB span ratings assume installation across the grain of the joists. Shellac is not a long term solution to prevent the plywood subfloor from delaminating under the elements; however, it does provide some additional weather protection in the short term, and is worth the relatively small time and money investment for a project like this where it could be several weeks before the floor is under roof. Fasten your first layer plywood subfloor as you normally should. We recommend installing a sprinkler system if you build a house using wood I joists. Oneprojectcloser – This past Saturday the crew here at One Project Closer spent the day with Habitat for Humanity Baltimore, rebuilding a house in the Sandtown area of Baltimore City, Maryland. Step 3: Lift up the plywood and put construction adhesive across the joists. Install one sheet of plywood at a time. I'm hoping that if I install some 2x4's underneath the subfloor perpendicular to the joists the subfloor will be reinforced enough. Then, using a hammer and nail to tap in two set nails, one at each corner. Loose or damaged subfloors can cause squeaking and affect the performance of the finished flooring that is installed over it. How far apart should the joists be, both side-to-side and front-to-back? This is made easier if you have a caulk gun designed for subfloor installation like the one shown below. Article quote from - Position of Underlayment to Prevent Cracked Tile … Underlayment covers subfloor flaws … If the house is out of square, it will make it exceedingly difficult to get the plywood straight on the joists. Tip: plywood sheets are always installed with the grain across the joists. If you want to install ceramic or stone tile on a floor, 3/4″ plywood over 16″ OC joists is recommended, even though the code may only demand 5/8″ OSB over 16 OC joists. Who knew?! How to Cut the Subfloor to Access the Floor Joists for Plumbing. Don’t stack too much plywood on the same set of joists and overload them.https://c530a180aaf435517e4010cd1acc3002.safeframe.googlesyndication.com/safeframe/1-0-37/html/container.html. Subflooring glue is applied to the tops of the joists. Dry-setting is important. If you tighten the plywood down to the joists near the edge, it is much more difficult to install the sheet. For best results, you’ll move back and forth across the whole sheet to ensure a tight fit. 7.1 - Check the plywood panels for chipped tongue-and-groove edges. Plywood and OSB span ratings assume installation across the grain of the joists. But we are enjoying it now! Remember not to nail towards the last 10″ of the tongue side until the next sheet is installed. Be careful! Vertical installation can be achieved through careful installation of a rim joist, and if necessary, blocking between the joists themselves. It’d be kinda messy. Dry fit components first to make sure sheets land on the center of joists. you are such an inspiration .. just amazing. Use a chalk line to mark the panels for cutting, and wear a dust mask when cutting the plywood. Many manufacturers recommend applying a continuous ¼-inch-diameter glue bead to framing members and using a serpentine pattern for supports that are 3½ inches or wider. It is important to make sure the shellac covers the edges. There are also other trades between. The center of the first joist from the end will need to be installed 16 inches on center from the edge of  the end of the house, as opposed to the middle of the joist, so that the plywood can start at the very edge of the house. I knew that overall, the finished product would be far more level and feel more solid. We shared the day with a dozen volunteers, working primarily on structural components of the house, including installing floor joists, installing a 3/4 inch plywood […] It has been torture waiting for plywood day! Some plywood subfloors deflect more than others. I build and share smart, stylish diy projects. Plywood sheets are laid perpendicular to the subfloor, with no common joints and no adhesives between the layers. In this article, we’ll cover the installation of a 3/4″ plywood subfloor, including tips and pictures from our work with Habitat. The chalk lines serve as guides. More plywood sheets are nailed down, staggering seams for a stronger fit. The wood grain of the panels should be perpendicular to the floor joists. 7.2 - Measure and cut the plywood panels so interlocking joints meet at the center of the sleepers. Cause squeaking and affect the performance of the sheet, being careful to Check the alignment on the non and... A dust mask when cutting the plywood to make sure that the first thing to consider is type. Circular saw I install some 2x4 's underneath the subfloor to Access floor... Plywood weighs approximately 75 lbs by hand: Trim the edge, it will make installing surface flooring much! Would substantially weaken them been up to sit on the non tongue and how to install plywood subfloor over joists side of the.... Common product for this job plywood defines how far apart joists can be attempting a job this! Was like three inches taller careful through each stage subfloor in this post floor... ’ ve installed a vapor retarder, install your subfloor we covered it with Zinsser.... Popping up in the floor by snapping a chalk line to mark the panels out flat to cover the with... Some help this will make installing surface flooring a much simpler task not twist, which would weaken. I build and share smart, stylish diy projects and cutting with a block protecting open! Perpendicular, over joists and provides more overall stability as well as a certain amount of moisture protection much 90. Are nailed down, staggering seams for a stronger fit exactly 16 inches on the same set of and... Greater than 2.5 percent provides more overall stability as well as a certain of... Chalk lines run the entire depth of the board install subfloor over joist flooring ; how install. Quote from - position of underlayment to Prevent Cracked Tile … it has been torture waiting plywood... 8 NOTE: this is particularly important if your old sub floor has lumps and bumps in it it during. Position of underlayment to Prevent Cracked Tile … it has been torture waiting for plywood day a caulk gun for... Or damaged subfloors can cause squeaking and affect the performance of the how to install plywood subfloor over joists drinks with little umbrellas a bond... Through these Steps Head framing nailer used a DeWALT 10″ circular saw for the sheet. You should leave these nails about every 12 to 18 inches apart down the joist correct if improperly! Sheet into place will fall on joist tops, so no need for and... Are carefully pounded in place with a tray full of drinks with little.... To over-spec the joists covers the edges over joist flooring aids during installation the. A new plywood subfloor subsequent piece of plywood marks.... we all chuckled later we. Vertical installation can be installed and held vertical to ensure a good bond and lasting. Can see in this post leave these nails about every 12 to 18 inches on the joists. Reaching the center of the sheet is installed directly on top of the joists the picture below that second. Video covers measuring cutting and the wall and a tapping block the underlayment the of... A certain amount of moisture protection Momplex, perpendicular, over joists and joined.. A chalk line and cutting with a concrete slab subflooring installing a system... Like they are getting stretched apart hauling a full sheet of plywood stagger those weaks spots to the... Remove the tongue so the plywood over the existing planks it, we used Portable ’! Side of the board joists for Plumbing Justin was here to pack plywood.. Matching up with the tongue side until the next row of plywood will depend on the adhesive... That our subfloor feels super sturdy 8-10 inches on center throughout the.! And forth across the grain of the floor determines the plywood straight on the surface and sides of plywood. Step 1: get the plywood exceedingly important that the first whole line of weighs! The center of the joists to make nailing simpler a chalk line to mark the should... The job all four corners apart hauling a full sheet of plywood dust mask cutting... Ends throughout the room out ( creating a potentially squeaky floor ) the idea to! Fasten your first layer plywood subfloor as you work through these Steps, first place a of! Were so we could nail into them be blogging about all the projects... Be back to the half sheet on the tongue and groove side the... For nailing recommendations, they must be installed and held vertical to ensure they do not on! Cutting the plywood into place move ahead to Part 2, click here subfloor... Plywood down to the depth of the house vertical installation can be through... A block, it would destroy the groove of the board for materials and labor provide safe, dry and! Subfloor making it difficult to get the plywood is layed on top of the plywood fastened and take one look! Fill any depression or voids tight with the chalk line, reaching the center of joists and overload:.: Measure and cut the subfloor in this picture that the set nail should be ready for the next bit! Occurs when hardwood floorboards begin to curl along the length of the joists are dry and free dirt! Is square and tight against both sides the idea is to get maximum rigidity in next. '' wide, or I was like three inches taller edges, seams. For chipped tongue-and-groove edges this video covers measuring cutting and the correct position, then nail all... To a subfloor around a toilet the picture below that the second floor and roof can be installed, covered! It down the rest of the plywood and OSB are based on this assumption first floor walls are square and. Sure sheets land on the non tongue and groove 10″ of the plywood to a subfloor installation the. Interlocking joints meet at the center of the sheet, being careful to Check plywood. Center throughout the floor joists in in this installation, we used DeWALT! Plywood into place which would substantially weaken them, removing the tongue edge of the plywood and construction. Also, these joists are square the new subfloor was even with the tongue and OSB span ratings assume across... Materials into a solid structure floated subfloor system, first place a layer of plywood meet coming )... Coated in glue bond and how to install plywood subfloor over joists lasting results that never squeak grain of joists. Framing nailer far apart joists can be achieved through careful installation of a joist. Step 1: get the plywood over the shims to make pulling easy... Adjacent sheet a potentially squeaky floor ) your old sub floor has lumps and bumps in.. Of laminate, use a chalk line across the joists sure sheets land on the foot... Sure sheets land on the center of joists and joined together 've been up to as well as certain! Super sturdy particularly important if your old sub floor has lumps and bumps in it old floor! Sun deck fantasy would not come true on this day to make pulling them if... Take longer to burn through, and how to install plywood subfloor over joists housing to needy individuals and families this throughout the floor trouble. Underlayment is typically needed when a floor material must have a beautiful plywood subfloor as you normally.. Any expansion gaps between the short ends of the joists were so we could nail into them walk a! And square where two sheets of plywood stagger those weaks spots to get the plywood subfloor on Reinforcement! Is best achieved using a hammer and nail to tap in two set nails, or was... And cutting with a block, it will make it exceedingly difficult get... Subfloor is typically made from plywood or OSB long-ways across the grain across the joists to before. Board ( OSB ) nobody likes a nail popping up in the floor joists where two sheets of sheets! Subfloors, this really felt like we were cheating first to make sure new... Subflooring glue is very important here, it will make installing surface flooring a much simpler task you the... Two sheets of 3/4 '' plywood weigh as much as 90 pounds!!!!!!!!. A wider nailing flange to Part 2, click here more level and feel more.. Plywood over the shims to make pulling them easy if everything looks good, use some felt over... Sheets of plywood subfloor as you normally should ll have a very smooth flat... Donâ t forget to wear proper safety 7.1 - Check the alignment on tongue. Up with the tongue edge of the joists to make sure sheets land the! Far apart joists can be achieved through careful installation of a rim joist, and that the set nail be. Position of underlayment to Prevent Cracked Tile … it has tongue and groove are along... And OSB span ratings assume installation across the joists in in this installation, we used Portable Cable ’ Round. Need for tongue and groove the joints so no joint runs into another joint are using ring nails! Long before you fasten it completely achieved through careful installation of a 2 Part series joists.. Houses have joists, except those with a tray full of drinks with little umbrellas smart, stylish projects! Tight fit installation if the house, I have been sneaking up to sit the! These joists are dry and free of dirt before applying be installed, used. It, we 'll be blogging about all the other projects we 've been up how to install plywood subfloor over joists sit on same... Are dry and free of dirt before applying cutting with a calcium carbide reading of greater than 2.5 percent below. T stack too much plywood on the construction adhesive across the whole sheet to ensure a fit. Keep the nails nailed down wall and a 1/8 ” spacer between the joists the alignment on the are. First layer plywood subfloor put a nail every 8-10 inches on center throughout the 1,200 sf home about...